41. Hercules S.A. at the Siekierki Cogeneration Plant in Warsaw  
We are building a staircase and a roof structure for the complete “ProAsh” ash separation plant at the Siekierki Cogeneration Plant in Warsaw under a contract with PM Technologies Sp. z o.o. For…  
42. Another large housing estate in Wilanow being built with Hercules S.A.  
Fabet-Konstrukcje Sp. z o. o., a sub-contractor for Robyg S.A., a construction developer, has trusted us again. The project will build a large housing estate with commercial infrastructure. The…  
43. Hercules S.A.’s cranes will handle Lotos Oil Refinery’s overhauls  
Naftoremont Naftobudowa, a member of the Polimex-Mostostal Holding, has commissioned Hercules to provide cranes for the scheduled overhaul of oil processing facilities “900”, “1100” and “1250” of…  
44. Installation of the boiler in the new Power Station EC Fortum in Zabrze  
Under the contract from the company ZRE Katowice S.A., we are carrying out installation of the new multi-fuel boiler at the construction site EC Fortum in Zabrze. This task is carried out with the…  
45. Construction of railway connector Kraków Zabłocie - Kraków Krzemionki  
Within this investment, two railway tracks will be constructed on overpasses of total length 2.6 km (track no 1 – 1.2 km and track no 2 – 1.4 km) between railway tracks Kraków Główny – Medyka and…  
46. Construction of bridge objects in Czarnowąsy  
During the months: October, November and December of 2016, Herkules S.A., under the contract from the company ABM Solid, was carrying out and still continue to carry out works connected with…  
47. Embarkation of damaged railway carriages with the crane Grove GMK 5170  
On 18th of October at railway station in Sośnie Ostrowskie (close to Ostrów Wielkopolski), we embarked 7 pieces of dump carriages, type 511V, damaged as a result of railroad accident, using the…  
48. Herkules S.A. has installed flue gas ducts in Opole Power Station  
Under the contract from the company Stal - Systems S.A., we have carried out installation of the flue gas ducts in construction site of power units No 5 and 6 in Opole Power Station. The task was…  
49. Opole Power Plant Construction site  
We delivered and installed flue gas supply ducts between the absorber and the cooling stack at the Opole Power Plant construction site on an order from Dutch Plasticon Composites. Subsequent duct…  